Heikstep Bridge
Bridge Project No. (1) next to the Military Engineers Warehouse in front of the Ahmed Orabi Association in Heikstep
The Heikstep Bridge is (180 m) long and (29.6 m) wide and consists of 6 spans and (7) main axes – (38) depth foundations, (60) beams with a length of (29.8 m), (7) frames, and (18) columns










