Construction work on a tunnel at the intersection of Salah Salem Road and Imam Al-Shafi’i Road, Old Cairo District, Cairo.
The tunnel is 46 meters long, 41 meters wide, and 8.50 meters high. It consists of three main axes and includes 88 piles. Deep foundations