Samira Moussa Tunnel

Back to Posts

Samira Moussa Tunnel

Construction work on the tunnel linking the Samira Moussa Axis tunnels and the Ravel Compound project.

It is implemented by Egy Drill Egypt for drilling and contracting works
Under the supervision of the Armed Forces Engineering Authority – Military Engineers Department,
( The first stage: The tunnel body consists of 3 main axes, 150 m long, 24 m wide, and 7 m high)
( The second stage: – Entrance and exit walls with a length of 700 m)

Back to Posts